Introduction

Greater power system flexibility is required for integration of a high share of variable renewable energy. While greater power system flexibility could be found in dispatchable power plants, demand side management, storage and Interconnection to other areas, the smart grid will be at the core of future power and information exchange. The first objective of this project was to undertake the necessary research in support of the CNC/IEC Task Force on Smart Grid Technologies and Standards in Canada. The second objective of this project was to assess a novel communication solution for demand response and renewable balancing. The third objective of this project was to clarify the technological options and requirement to ensure seamless integration of distributed energy resources (flexible) in power system operation and markets To meet these objectives a number of outputs were produced during this project.

Activities and results

CNC/IEC Task Force on Smart Grid Technologies and Standards : Technology standardization is particularly important in the context of transitioning to a smarter electricity grid. Natural Resources Canada, together with the Standards Council of Canada, established a Smart Grid Standards Task Force to respond to, and provide Canadian input into, standardization efforts being spearheaded by the U.S. National Institute of Standards and Technology and at the International Level by the Electrotechnical Commission. The Task Force contributors included utilities, equipment manufacturers and regulators (Figure 1). CanmetENERGY, in collaboration with Standards Council of Canada and partners, have established a national Smart Grid Technology and Standards Task Force. The Task Force collaborated to identify key priority areas for Canadians, participate in joint projects that aim to develop North American standards and provide recommendations for the advancement of global standards efforts managed by the International Electrotechnical Commission (IEC). This effort managed by CanmetENERGY at the Varennes (Quebec) research centre and The Electrofederation of Canada lead to “The Canadian Smart Grid Standards Roadmap a strategic planning document”[2]. This document is the work product of over 50 members from the smart grid industries and stakeholders. CanmetENERGY has a core team of experts in the area of smart grid and coordinated the federal technical review of the final report. Several federal departments and agencies contributed to the work of a task force on Smart Grid Technology and Standards, including Measurement Canada, Industry Canada, Public Safety Canada, Defence Research and Development Canada, Office of the Privacy Commissioner of Canada, and the National Energy Board. NRCan supported this effort through a contribution agreement with the Electrofederation of Canada, a national not-for-profit industry association representing over 330 companies that manufacture, distribute and service electrical and electronics products.

Development of a test bench to test demand response solutions : The introduction of distributed energy resources in a Smart Grid would require thousands to millions of access points to be controlled simultaneously to provide all sorts of services to the grid, including renewable energy balancing. Scalable solutions are therefore required, as well as adaptable solutions to all sorts of end-use devices (smart appliances, air and water heating and cooling system, inverters, electric car chargers, energy management systems, etc). The purpose of this activity was to test a novel demand response concept that would facilitate “addressing” a large number of devices to support the power system [4]. This new concept uses the strength of the Internet network to develop load communities capable of self-regulating their consumption based on information provide by an operator.

Listing of Task Force members for Smart Grid Technology and Standards

Figure 1: Task Force of Smart Grid Technology and Standards

Text version: Figure 1

Figure 1

The Smart Grid Standards Task Force contributors included utilities, equipment manufacturers and regulators. The task force was reporting to the Canadian National Committee to the International Electrotechnical Commission (IEC), chaired by Keith Rodel from Hubbell Canada. The secretary was Darryl Kingston from Standards Council of Canada (SCA). Members of this task force were International Electrotechnical Commission (IEC), Information Technology Association of Canada (ITAC), Canadian Manufacturers & Exporters (CME), Electro-Fed Canada (EFC), Underwritters Laboratories of Canada (ULC), Standards Council of Canada (SCA), Industry Canada, and Canadian Police Information Centre (CPIC) for customers. This group was reporting itself to the IEC Standard Management Board.

The SCC Task Force on Smart Grid Technology Standards was co-chaired by Lisa Dignard-Bailey from Natural Resources Canada and Bill Bryans from Electro-Fed Canada. The task force was divided into eight subgroups: Building Infrastructure; Distribution Field Equipment; Transmission; Enterprise Level/Integrator; Regulator; General; Standards Development Organizations (SDO); and Security.

The Building Infrastructure subgroup was comprised of Jason Crossman from Hubbell Canada; Ludo Bertsch from CABA; and Tony Capel from Comgate Eng. Alexandre Prieur from Natural Resources Canada and André Brandau from Industry Canada also contributed.

The Distribution Field Equipment subgroup was comprised of Ivano Labricciosa from Toronto Hydro; Daniel Desrosiers from CYME International; and Justin Farrell from Hydro Ottawa. D. Reeves and G. Macleod from Hydro Ottawa; and Sol Lancashire from Hydro One also contributed.

The Transmission subgroup was comprised of Edward Arlitt from IESO; Jamie Hall from Manitoba Hydro; and Jean Goulet from IREQ/HQ. Kip Morison from BCTC and Ed Tymofichuk from Manitoba Hydro also contributed.

The Enterprise Level/Integrator subgroup was comprised of Scott Fawcett from CISCO; David Curtis from Hydro One; and Bruce Orloff from IBM. Bill Munson from ITAC; Jim MacFie from Microsoft Canada; Fred Baker from CISCO; and Barry Pratt from Rogers also contributed.

The Regulator subgroup was comprised of Tab Gangopadhyay from the National Energy Board; John Lawton from NB E.U. Board; and B. Hweson and R. Holdin from ON E. Board. Robert Thomas from Alberta Util. Comm.; Colman Ho, D. Gibson, and Michael Christensen from Industry Canada; Gilles Vinet and L. Tessier from Measur. Canada; and Usman Syed from ON. Min. Energy also contributed.

The General subgroup was comprised of Grant Gilchrist from Enermex; Eric MeWhinney from BC Hydro; Avygdor Moise from DOR R&D; and Keith Jansa from CEA.

The Standards Development Organizations (SDO) subgroup was comprised of John O'Neil from CSA; Mike Prassad from ULC, Begonia Lojk from SCC; and Paul Molitor from NEMA.

The Security subgroup was comprised of Rose Coelho from Public Safety Canada; Abbie Barbir from Bank of America; and Jack Pagotta from DRDC.

During this activity, CanmetENERGY completed the installation of a test bench (Figure 2) linking one electric water heater to a community of thousand of simulated nodes. Both hardware and software development were completed to interface with the electric water heater, to establish the communication with thousands of simulated agents (Figure 3), to build a visualization platform in laboratory and to simulate the impact on the power system. Now that the preliminary work is completed, the programming of the novel demand response solution has begun and a proof of concept in laboratory is planned in 2012 (refer to discussion and next step section).

Temperature sensor and microcontroller used for interfacing with the community of loads over the Internet

Figure 2: Demand Response test bench with an electric water heater

Temperature sensor and microcontroller used for interfacing with the community of loads over the Internet

Figure 3: Temperature sensor and microcontroller used for interfacing with the community of loads over the Internet

 

Publication on smart grid and flexible resources : The third objective of this project was to clarify the technological options and requirements for Smart Grid integration of distributed energy resources (flexible resources). To meet this objective, several outputs were produced during this project. This includes the report : “Smart Grid to balance Renewable Energy - Contributing Distributed Energy Resources”[5] explaining the challenges of integrating distributed energy resources in power systems, presenting the research state-of-the-art in the area and reviewing current market practices. In addition, a report produced by CRC and CanmetENERGY on “Communications Technologies for Flexible Resources within the Customer Premises”[6] and the related “Assessment of Communications Technologies for Smart Grids”[7] conference papers are all contributing at informing the industry of technological options and barriers.

Discussion and next steps

This 18 months project funded by the Clean Energy Fund Program at NRCan supported several R&D initiatives in the area of smart grid and the introduction of distributed energy resources. In summary, a task force aiming at fostering collaborating on standards development was supported, along with the publication of a report on the challenge of balancing renewable and communicating with end-use devices. The project financed the development of a demand response test bench to support future proof of concept and standardization work in that field. The preliminary work to prove a novel demand response solution was completed, which include the hardware and software development to manage a real load, simulate the communication with simulated agents, store data and visualize the results.

This project was critical to the orientation of the smart grid research at CanmetENERGY-Varennes. It supported investigation on the current state-of-the-art, on barriers and knowledge gaps in the industry and well as promising technologies and business models. For example, this project highlighted the importance of open standards, open networks (like the Internet) and open power markets (open to DER participation) to foster the development of demand response, storage and distributed generation. This project emphazed the role of aggregation in the future electrical industry, to support local communities during outages (microgrids) or the bulk power system (virtual power plants) on day-to-day operation.

This project led to the preparation of a new Eco-Energy Innovation Initiative project proposal: Real node environment for balancing renewable generation with flexible resources (RENI-509). This project will further develop demand response solutions to provide different services to system operators or utilities. A major focus will be on finalizing the proof-of-concept in laboratory, expand the solution to more devices types (inverters, EV charger, thermostats) (Figure 4) and to test the solutions with utilities. With the demand response test bench, the Standardization work will also continue with test on algorithms, protocols and the development of “use-cases”.

diagram showing laboratory facilities

Figure 4: Overview of real node environment for balancing renewable generation with flexible resources<

Text version: Figure 4

Figure 4

Figure 4 shows the laboratory facilities that will be developed at CanmetENERGY to test solutions to balance renewable energy production with flexible loads. It is a real-time simulator that interacts with actual loads, communities of simulated loads and simulated renewable energy production. This architecture includes communication with actual loads, as well as their thermal behavior simulation. In addition, the loads actual electrical behavior can be integrated to a power circuit. Among the types of loads that can be tested, we find electric vehicles, water heaters, intelligent inverters, and intelligent building energy systems. CanmetENERGY's facilities already have an actual water heater; a simulator of community of water heater; resistive, capacitive, and inductive loads; conventional inverters; and AC source.

Budget

F31.007A and B (077CE-A,B) 2010-2012
CEF Other
Federal
External
in-kind
External
Cash
Leverage
420 k 74 k 141 k - 50%

Project Team

  • CanmetENERGY: Alexandre Prieur, David Beauvais, Arsène Sabas, Jean-Luc Victor, Salman Nazir, Vincent Boisselle, Fernando Colangelo, Claude Guay, Michael Léonard
  • Communication Research Center: Andre Brandao, Julie Haiying Zhu, Jasmin Roy, François Lefebvre
  • University of Sherbrooke: Philippe Mabilleau, Simon Ayoub
  • McGill University: François Bouffard
  • Task Force Members: Refer to Figure 1 for a list

References and Publications

  1. International Energy Agency, “Harnessing Variable Renewables − A Guide to the Balancing Challenge”, 200 pp., ISBN 978-92-64-11138-7;
  2. Alexandre Prieur and Ludo Bertsch, Examples of Smart Home Technology Projects across Canada, Presentation to CNC/IEC Task Force on Smart Grid, July 2010.
  3. Standard Council of Canada, The Canadian Smart Grid Standards Roadmap – a strategic planning document, prepared by the CNC/IEC Canadian Smart Grid Technology and Standard Task Force, Accepted for publication, 2012.
  4. Simon Ayoub, Philippe Mabilleau, Alexandre Prieur, David Beauvais, Alain Moreau, “Distributed Load Management Algorithm for a Virtual Community of Electric Loads”, submitted to the journal IEEE transaction on Smart Grid, 2012
  5. David Beauvais, Alexandre Prieur and François Bouffard, “Smart Grid to balance renewable energy – Contributing Distributed Energy Resources”, CanmetENERGY, 2012-177 (RP-TEC) 411-FLEXIN.
  6. “Communications Technologies for Flexible Resources within the Customer Premises”, CRC report, 2012 (publicly available at www.crc.ca)
  7. Communication Research Center, Assessment of Communications Technologies for Smart Grids, to be published 2012.