Electric Vehicle and Alternative Fuel Infrastructure Deployment Initiative - Successful Applicants - Phase 1
- 1. About
- 2. Eligibility
- 3. Before you apply
- 4. How to apply
- 5. After you apply
- 6. Request Application Package
- 7. Service Standards
- 8. Successful Applicants - Phase 1
- 9. Successful Applicants - Phase 2
- 10. News and FAQs
- 11. Infrastructure map
- 12. Contact Us
NOTICE:
The 2020 Request for Proposals of the Electric Vehicle and Alternative Fuel Infrastructure Deployment Initiative is now closed.
**Temporary Measure - Extended Project Completion**
As the second wave of COVID-19 continues to cause supply chain disruptions and operational restrictions, the Program is now allowing up to an additional 12 months to complete projects. As a result, proponents may have up to 30 months from the date of agreement signature for the completion of EV charging projects, and up to 36 months from the date of agreement signature for hydrogen and natural gas refuelling projects.
As the financial authority of the EVAFIDI program ends on March 31, 2022, a project's completion date may be extended, but eligible expenditures for reimbursement must be incurred before March 31, 2022.
Note that the completion date indicated in a signed contribution agreement takes precedence. Therefore, to avail yourself of this accommodation, you must contact your NRCan project officer or email nrcan.taf-tcr.rncan@canada.ca, as an amendment to existing agreement will be required.
Here is a list of projects being funded under the Program:
(Only projects for which a contribution agreement has been signed are listed).
| Proponent | Project | NRCan Funding | NRCan Funding Program | Province | Address | Status |
|---|---|---|---|---|---|---|
| EBI Énergie Inc. | 1 natural gas refuelling station | $1,000,000 | Green Infrastructure – Phase 1 | Quebec | 61 rue Notre-Dame, Berthierville, QC | Under construction |
| EBI Énergie Inc. | 1 natural gas refuelling station | $1,000,000 | Green Infrastructure – Phase 1 | Quebec | 1250 chemin Craig et 1287 chemin de la Coopérative Lévis, QC |
Open to the public |
| EBI Énergie Inc. | 1 natural gas refuelling station | $1,000,000 | Green Infrastructure – Phase 1 | Quebec | 4900 Rue Raymond-Bellemare Trois Rivières, QC |
Open to the public |
| Enbridge Gas Distribution Inc. | 1 natural gas refuelling station | $502,000 | Green Infrastructure – Phase 1 | Ontario | 1799 Pettit Road Fort Erie, ON |
Open to the public |
| Regional Municipality of Peel | 2 electric vehicle charging stations at Region of Peel Municipal Buildings | $100,000 | Green Infrastructure – Phase 1 | Ontario | 10 Peel Centre Drive Brampton, ON |
Open to the public |
| 7120 Hurontario Street Mississauga, ON |
Open to the public | |||||
| Union Energy Solutions | 1 natural gas refuelling station | $1,000,000 | Green Infrastructure – Phase 1 | Ontario | 4040 Essex County Road 46 Windsor, ON |
Open to the public |
| Clean Energy Compression Corporation | 1 natural gas refuelling station | $1,000,000 | Green Infrastructure – Phase 1 | Ontario | 3700 Highbury Avenue South London, ON |
Open to the public |
| Nova Scotia Power Incorporated | 3 electric vehicle fast-charging stations along Highway 101 | $150,000 | Green Infrastructure – Phase 1 | Nova Scotia | 7203 Nova Scotia Trunk 1 Coldbrook, NS |
Open to the public |
| 110 Warwick Street Digby, NS |
Open to the public | |||||
| 87 Starrs Road Yarmouth, NS |
Open to the public | |||||
| Nova Scotia Power Incorporated | 1 electric vehicle fast-charging stations along Highway 105 | $50,000 | Green Infrastructure – Phase 1 | Nova Scotia | 441 Shore Road Baddeck, NS |
Open to the public |
| Nova Scotia Power Incorporated | 1 electric vehicle fast-charging stations along Highway 125 | $50,000 | Green Infrastructure – Phase 1 | Nova Scotia | 116 King Street North Sydney, NS |
Open to the public |
| Nova Scotia Power Incorporated | 3 electric vehicle fast-charging stations along Highway 104 | $150,000 | Green Infrastructure – Phase 1 | Nova Scotia | 10653 Nova Scotia Trunk 2 Masstown, NS |
Open to the public |
| 130 North Foord Street Stellarton, NS |
Open to the public | |||||
| 10125 Highway #4 Monastery, NS |
Open to the public | |||||
| Nova Scotia Power Incorporated | 1 electric vehicle fast-charging stations along Highway 102 | $50,000 | Green Infrastructure – Phase 1 | Nova Scotia | 267 route NS-214 Elmsdale, NS |
Open to the public |
| Nova Scotia Power Incorporated | 3 electric vehicle fast-charging stations along Highway 103 | $150,000 | Green Infrastructure – Phase 1 | Nova Scotia | 527 Highway 10 Cookville, NS |
Open to the public |
| 180 Bristol Avenue Liverpool, NS | Open to the public | |||||
| 90 Ohio Road Shelburne, NS |
Open to the public | |||||
| Le Groupe Harnois Inc. | 3 electric vehicle fast-charging stations along Highway 15 | $150,000 | Green Infrastructure – Phase 1 | Quebec | 1468, route 117 Saint-Faustin-Lac-Carré, QC |
Open to the public |
| 258, rue Valiquette Ste-Adèle, QC |
Open to the public | |||||
| 17555, rue Charles Mirabel, QC |
Open to the public | |||||
| Le Groupe Harnois Inc. | 1 electric vehicle fast-charging station along Highway 125 | $33,500 | Green Infrastructure – Phase 1 | Quebec | 120, rue Saint-Isidore Saint-Esprit, QC |
Open to the public |
| Le Groupe Harnois Inc. | 1 electric vehicle fast-charging station along Highway 131 | $33,500 | Green Infrastructure – Phase 1 | Quebec | 565, route 131 Notre-Dame-des-Prairies, QC |
Open to the public |
| AddÉnergie Technologies Inc. | 4 electric vehicle fast-charging stations at Canadian Tire | $200,000 | Green Infrastructure – Phase 1 | Ontario | 1115 Wellington Road South London, ON |
Open to the public |
| 465 Norwich Avenue Woodstock, ON |
Open to the public | |||||
| 30 Lynden Road Brantford, ON |
Open to the public | |||||
| 777 Upper James Street Hamilton, ON |
Open to public | |||||
| AddÉnergie Technologies Inc. | 8 electric vehicle fast-charging stations at Canadian Tire | $300,000 | Green Infrastructure – Phase 1 | Ontario | 7624 Thorold Stone Road Niagara Falls, ON (2 stations) |
Open to the public |
| 103 Bell Boulevard Belleville Belleville, ON |
Open to the public | |||||
| 2070 Appleby Line Burlington, ON |
Open to the public | |||||
| 1100 Kerr Street Oakville, ON |
Open to the public | |||||
| 1608 The Queensway Etobicoke, ON |
Open to the public | |||||
| 1202 Dundas Street East Mississauga, ON |
Open to the public | |||||
| 1735 Pickering Parkway Pickering, ON |
Open to the public | |||||
| AddÉnergie Technologies Inc. | 1 electric vehicle fast-charging station at Canadian Tire | $50,000 | Green Infrastructure – Phase 1 | Ontario | 2070 Appleby Line Burlington, ON |
Open to the public |
| AddÉnergie Technologies Inc. | 3 electric vehicle fast-charging stations at Canadian Tire | $150,000 | Green Infrastructure – Phase 1 | Ontario | 400 Weber Street North (2 stations) Waterloo, ON |
Open to the public |
| 2905 King Street East Kitchener, ON |
Open to the public | |||||
| AddÉnergie Technologies Inc. | 5 electric vehicle fast-charging stations at Canadian Tire | $250,000 | Green Infrastructure – Phase 1 | Ontario | 239 Fountain Street South Cambridge, ON |
Open to the public |
| 20 Market Drive #1 Milton, ON |
Open to the public | |||||
| 5067 Dixie Drive, Mississauga, ON |
Open to the public | |||||
| 1080 Kerr Street Oakville, ON |
Open to the public | |||||
| 1735 Pickering Parkway Pickering, ON |
Open to the public | |||||
| AddÉnergie Technologies Inc | 1 electric vehicle fast-charging station at Canadian Tire | $50,000 | Green Infrastructure – Phase 1 | Ontario | 3850 Hwy 7 Woodbridge ON |
Open to the public |
| AddÉnergie Technologies Inc. | 3 electric vehicle fast-charging stations at Canadian Tire | $150,000 | Green Infrastructure – Phase 1 | Ontario | 3850 Hwy 7 Woodbridge ON |
Open to the public |
| 8830 Yonge Street (2 stations) Richmond Hill ON |
Open to the public | |||||
| AddÉnergie Technologies Inc. | 3 electric vehicle fast-charging stations at Canadian Tire | $150,000 | Green Infrastructure – Phase 1 | Alberta | 169 Ordze Avenue Sherwood Park, AB |
Open to the public |
| 5908 Gaetz Avenue Red Deer, AB |
Open to the public | |||||
| 940 Macleod Trail South East Calgary, AB |
Open to the public | |||||
| New Brunswick Power Corporation | 19 electric vehicle fast-charging stations along the Trans-Canada | $950,000 | Green Infrastructure – Phase 1 | New Brunswick | 100 Grey Rock Road Edmunston, NB |
Open to the public |
| 16 F. Tribe Road Perth-Andover, NB |
Open to the public | |||||
| Route 2 Saint-André, NB |
Open to the public | |||||
| 198 Beardsley Road Beardsley, NB |
Open to the public | |||||
| 10 Route 635 Lake George, NB |
Open to the public | |||||
| 415 Nevers Road Lincoln, NB |
Open to the public | |||||
| 10995 Route 10 Young’s Cove, NB |
Open to the public | |||||
| 2986 Fredericton Road Salisbury, NB |
Open to the public | |||||
| 2731 Mountain Road Moncton, NB |
Open to the public | |||||
| 170 Aulac Road Aulac, NB |
Open to the public | |||||
| 224 Street Canada Saint-Quentin, NB |
Open to the Public | |||||
| 2 Martin Drive Eel River Bar, NB |
Open to the Public | |||||
| 1450 Vanier Boulevard Bathurst, NB |
Open to the public | |||||
| 3323 De La Rive Street Tracadie-Sheila, NB |
Open to the public | |||||
| 2433 King George Highway Miramichi, NB |
Open to the public | |||||
| 330 Main Street Doaktown, NB |
Open to the public | |||||
| 12 Park Drive Richibucto, NB |
Open to the public | |||||
| 10 Millenium Drive, Quispamsis, NB |
Open to the public | |||||
| 7386 Lepreau Village Road, NB |
Open to public | |||||
| Hydrogenics Corporation | 2 hydrogen refuelling stations in Ontario and Quebec | $2,000,000 | Green Infrastructure – Phase 1 | Ontario Quebec |
5105 Boulevard Wilfrid-Hamel Québec, QC |
Open to the public |
| 220 Admiral Boulevard Mississauga, ON |
Under Construction | |||||
| HTEC Hydrogen Technology and Energy Corporation | 1 hydrogen refuelling station in British Columbia | $1,000,000 | Green Infrastructure – Phase 1 | British Columbia | 4505 Canada Way Burnaby, BC |
Open to the public |
| BC Hydro and Power Authority | 7 electric vehicle fast-charging stations in British Columbia | $350,000 | Green Infrastructure – Phase 1 | British Columbia | 6163 University Boulevard Vancouver, BC |
Open to public |
| 1301 Lougheed Highway Coquitlam, BC |
Open to public | |||||
| 2332 160th Street Surrey, BC |
Open to public | |||||
| 4651 No.3 Road Richmond, BC |
Open to public | |||||
| 6435 Metral Drive Nanaimo, BC |
Open to public | |||||
| 133 West Fern Qualicum, BC |
Open to public | |||||
| 3455 Johnston Road Port Alberni, BC |
Open to public | |||||
| BC Hydro and Power Authority | 8 electric vehicle fast-charging stations in British Columbia | $400,000 | Green Infrastructure – Phase 1 | British Columbia | 16811 - 96th Avenue Surrey, BC |
Open to the public |
| Exit 228 Coquihalla Lakes Road Fraser Valley B, BC |
Open to the public | |||||
| 2791 Pacific Rim Highway Ucluelet, BC |
Open to the public | |||||
| 3000 Lougheed Highway Coquitlam, BC |
Open to the public | |||||
| 757 Ryan Road Courtenay, BC |
Open to the public | |||||
| 3185 Grandview Highway Vancouver, BC |
Open to the public | |||||
| 32136 Lougheed Highway Mission, BC |
Open to the public | |||||
| 350 South East Marine Drive Vancouver, BC |
Open to the public | |||||
| BC Hydro and Power Authority | 6 electric vehicle fast-charging stations in British Columbia | $300,000 | Green Infrastructure – Phase 1 | British Columbia | Bruce Street (6400 block) District of West Vancouver, BC |
Open to the public |
| 401 11 Avenue Campbell River, BC |
Open to the public | |||||
| 2330 Bevan Avenue Sidney, BC | Open to the public | |||||
| Homer Street (500 block) Vancouver, BC |
Open to the public | |||||
| Homer Street (500 block) Vancouver, BC |
Open to the public | |||||
| 5356 West Boulevard Vancouver, BC | Open to the public | |||||
| Union Energy Solutions | 1 natural gas refuelling station | $1,000,000 | Green Infrastructure – Phase 1 | Ontario | 628 County Road 41 Napanee, ON | Open to the public |
| AddÉnergie Technologies Inc. | 15 electric vehicle fast-charging stations at Cadillac Fairview shopping centres | $750,000 | Green Infrastructure – Phase 1 | Ontario Manitoba Quebec New Brunswick |
1090 Don Mills Road North York, ON |
Open to the public |
| 2960 Kingsway Drive Kitchener, ON |
Open to the public | |||||
| 1800 Sheppard Avenue East North York, ON |
Open to the public | |||||
| 5000 Highway 7 Markham, ON |
Open to the Public | |||||
| 999 Upper Wentworth Street Hamilton, ON |
Open to the Public | |||||
| 1680 Richmond Street North London, ON |
Open to the public | |||||
| 50 Rideau Street Ottawa, ON |
Open to the Public | |||||
| 25 The West Mall Boulevard Toronto, ON |
Open to the public | |||||
| 220 Yonge Street Toronto, ON |
Open to the public | |||||
| 1485 Portage Avenue Winnipeg, MB |
Open to the public | |||||
| 477 Paul Street Dieppe, NB |
Open to the Public | |||||
| 3035 Le Carrefour Boulevard Laval, QC |
Open to the Public | |||||
| 6801 Trans Canada Highway Pointe-Claire, QC |
Open to the Public | |||||
| 7999 Les Galeries Boulevard Montreal, QC |
Open to the Public | |||||
| 1 Des Promenades Boulevard Saint-Bruno, QC |
Open to the Public |
- Date modified: