Electric Vehicle and Alternative Fuel Infrastructure Deployment Initiative - Successful Applicants – Phase 2

NOTICE

The 2020 Request for Proposals of the Electric Vehicle and Alternative Fuel Infrastructure Deployment Initiative is now open. In order to adjust to the current situation related to COVID-19, the RFP will be open for an additional 30 days. Applicants must submit a completed application by July 23, 2020 (23:59 Eastern Time). The Program is aiming to release funding decisions by October 2020.

Please note that for this RFP, priority will be given to proposals that:

  • Increase the EV fast-charging infrastructure in under-served areas along Canada’s National Highway System.
  • Increase the natural gas and hydrogen refuelling infrastructure that extends freight corridors or creates new freight corridors.

Below is a list of projects being funded under the Program (please note: this list is subject to change).
Only projects for which contribution agreements have been signed are listed.

 

Proponent Project NRCan Funding NRCan Funding Program Province Address Status
Envoy Energy Fuels Inc. 3 natural gas refuelling stations $3,000,000 Green Infrastructure - Phase 2 Alberta, Saskatchewan, Manitoba  5500 Dufferin Boulevard, Calgary, AB Under construction
301 Adolph Drive, Sherwood Park, SK Under construction
1987 Brookside Boulevard, Winnipeg, MB Under construction
Envoy Energy Fuels Inc. 3 natural gas refuelling stations $3,000,000 Green Infrastructure - Phase 2 Ontario 535 Trans-Canada Highway, Nipigon, ON Under construction
1112 Front Street, Hearst, ON Under construction
3060 ON-11, North Bay, ON Under construction
British Columbia Ministry of Transportation and Infrastructure

12 electric vehicle fast-charging stations

6 Level 2 electric vehicle charging stations

$630,000

Green Infrastructure - Phase 2

Zero Emission Vehicle infrastructure Program

British Columbia BC-97, Groundbirch, BC
(3 stations)
Under construction
BC-97, Groundbirch, BC
(3 stations)
Under construction
BC-97, Groundbirch, BC
(3 stations)
Under construction
1201 103rd Avenue, Dawson Creek, BC
(3 stations)
Under construction
BC-97, Groundbirch, BC
(3 stations)
Under construction
BC-97, Groundbirch, BC
(3 stations)
Under construction
Hydro Québec 46 electric vehicle fast-charging stations $2,300,000 Green Infrastructure - Phase 2 Quebec 1107 route 315, Namur, QC Under construction
615 route 321 sud, St-André Avelin, QC Under construction
1185 chemin Royal, St-Pierre-de-l'île d'Orléans, QC  Under construction
2811 QC 327, Harrington , QC Under construction
360 rue Principale, St-Alphonse de Granby, QC Under construction
2 route St-Albert, Warwick, QC Under construction
373 boulevard St-Pierre, St-Raphael, QC Under construction
215 rue Rochette, St-Pascal, QC Under construction
8 chemin River, Cantley, QC Under construction
174 rue Principale, St-Nazaire, QC Under construction
100 rue Notre-Dame, Oka, QC
(2 stations)
Under construction
181 rue Principale, Aylmer, QC
(2 stations)
Under construction
101 rue de la Plage, St-Alphonse-Rodriguez, QC
(2 stations)
Under construction
1037 boulevard Pie-XI N, Val Bélair, QC
(2 stations)
Under construction
461 route 381, Ferland et Boileau, QC
(2 stations)
Under construction
6325 boulevard Taschereau, Brossard, QC
(2 stations)
Under construction
107 chemin Saint-François Xavier, Candiac, QC
(2 stations)
Under construction
373 rue St-Jacques, Napierville, QC
(2 stations)
Under construction
155 montée St-Régis, St-Constant, QC
(2 stations)
Under construction
3170 Monseigneur-Langlois, Valleyfield, QC
(2 stations)
Under construction
135 boulevard Céline Dion, Charlemagne, QC
(2 stations)
Under construction
380 montée Dumais, Lachenaie, QC
(2 stations)
Under construction
550 Elgin Nord, St-Pamphile, QC
(2 stations)
Under construction
700 St-Isidore, St-Lin, QC
(2 stations)
Under construction
44 Principale N, Sutton, QC
(2 stations)
Under construction
77 rue St-Georges, Windsor, QC
(2 stations)
Under construction
6377 rue Garneau, Sainte-Croix, QC
(2 stations)
Under construction
251 25ème avenue, St-Eustache, QC
(2 stations)
Under construction
Hydro Québec 48 electric vehicle fast-charging stations $2,400,000 Green Infrastructure - Phase 2 Quebec 2940 route 148, Pontiac, QC Under construction
45 place Quévillon, Lebel-sur-Quévillon, QC  Under construction
560 6ème rue ouest, Senneterre, QC Under construction
5 route 113, Waswanipi, QC Under construction
145 boulevard Springer, Chapais, QC Under construction
581 3ème rue, Chibougameau, QC Under construction
QC-167, Poisson blanc, QC Under construction
4272 route 112, East Broughton, QC Under construction
9 ème rue est, La Guadeloupe, QC Under construction
579 route 198, Murdochville, QC Under construction
3380 boulevard Ste-Anne, Ste-Anne, QC
(2 stations)
Under construction
45 2ème rang ouest, Métabétchouan, QC
(2 stations)
Under construction
88 rue Principale N, Sacré-Cœur, QC
(2 stations) 
Under construction
9752 boulevard Ste-Anne, Ste-Anne, QC
(2 stations)
Under construction
650 4ème avenue, Grandes-Piles, QC
(2 stations)
Under construction
6ème avenue / Wallberg, Dolbeau-Mistassini, QC
(2 stations)
Under construction
200 QC-132, Baie-des-Sables, QC
(2 stations)
Under construction
3800 boulevard Bécancour, Bécancour , QC
(2 stations)
Under construction
53 rue Notre-Dame, Cap Chat, QC
(2 stations)
Under construction
55 rue du Banc, Rivière au Renard, QC
(2 stations)
Under construction
46 rue de l'hôtel de ville, East Angust, QC
(2 stations)
Under construction
751 boulevard Perron, Careleton-sur-Mer, QC
(2 stations)
Under construction
1 rue St-Jacques N, Causapscal, QC
(2 stations)
Under construction
100 16ème avenue, Deschaillons sur St-Laurent, QC
(2 stations)
Under construction
2683 route 132, Le Bic, QC
(2 stations)
Under construction
580 2ème rang, Neuville, QC
(4 stations)
Under construction
Halte routière les jardins de Napie, St-Bernard de Lacolle, QC
(4 stations)
Under construction
HTEC Hydrogen Technology and Energy Corporation 1 hydrogen refuelling station $1,000,000 Green Infrastructure - Phase 2 British Columbia 9000 Glenlyon Parkway, Burnaby, BC Under construction
Harnois Energies 1 hydrogen refuelling station $1,000,000 Green Infrastructure - Phase 2 Quebec 625 rue Clémenceau, Quebec, QC Under construction
Tomlinson Environmental Services Inc. 1 natural gas refuelling station $1,000,000 Green Infrastructure - Phase 2 Ontario 952 Moodie Drive, Ottawa, ON Under construction
Philippe Gosselin et Associés Limitée 1 natural gas refuelling station $1,000,000 Green Infrastructure - Phase 2 Quebec 197 Autoroute 20 (Jean-Lesage), Saint-Germain, QC Under construction
Federated Co-operatives Limited 29 electric vehicle fast-charging stations $1,400,000 Green Infrastructure - Phase 2 Manitoba, Saskatchewan, Alberta 77 Vermillion Road, Winnipeg, MB
(2 stations)
Under construction
850 Dakota Street, Winnipeg, MB
(2 stations)
Under construction
3425 Roblin Boulevard, Winnipeg, MB
(2 stations)
Under construction
3357 Pembina Avenue, Winnipeg, MB
(2 stations)
Under construction
2255 Saskatchewan Avenue West, Portage La Prairie, MB
(2 stations)
Under construction
1035 Richmond Avenue, Brandon, MB
(2 stations)
Under construction
114 7th Avenue, Virden, MB Under construction
1206 Highway 1, Whitewood, SK Under construction
2925 Quance Street, Regina, SK
(2 stations)
Under construction
1592 9th Avenue North East, Moose Jaw, SK
(2 stations)
Under construction
1150 Central Avenue North, Swift Current, SK
(2 stations)
Under construction
14 Sidney Street, Maple Creek, SK
(2 stations)
Under construction
4560 Parliament Avenue, Regina, SK
(2 stations)
Under construction
1789 Strachan Road South East, Medicine Hat, AB Under construction
400 10th Avenue, Carstairs, AB
(2 stations)
Under construction
#3-32580 Range Road 11, Olds, AB
(2 stations)
Under construction
QuadReal Property Group G.P Inc. 1 electric vehicle fast-charging station $50,000 Green Infrastructure - Phase 2 British Columbia 2920 Virtual Way, Vancouver, BC Under construction
QuadReal Property Group G.P Inc. 1 electric vehicle fast-charging station $50,000 Green Infrastructure - Phase 2 British Columbia 2100-2180 Dollarton Highway, North Vancouver, BC Under construction
Suncor Energy Products Partnership, an Alberta Partnership 6 electric vehicle fast-charging stations $300,000 Green Infrastructure - Phase 2 British Columbia, Ontario   1743 Burrard Street, Vancouver, BC Under construction
924 5th Street, Kenora, ON Under construction
4 Hemo Drive, Marathon, ON Under construction
Highway 89 & 400, Cookstown, ON
(2 stations)
Under construction
Victoria Park and Sheppard, North York, ON Under construction
Rural Municipality of East St. Paul 1 electric vehicle fast-charging station $50,000 Green Infrastructure - Phase 2 Manitoba 3021 Birds Hill Road, East St. Paul, MB Under construction
City of Ottawa 1 electric vehicle fast-charging station $50,000 Green Infrastructure - Phase 2 Ontario 1490 Youville Drive, Orleans, ON Under construction
The Corporation of the City of North Vancouver 1 electric vehicle fast-charging station $50,000 Green Infrastructure - Phase 2 British Columbia 1100 block of 3rd Street East, North Vancouver, BC Under construction
City of Surrey 3 electric vehicle fast-charging stations $150,000 Green Infrastructure - Phase 2 British Columbia 15996 84th Avenue, Surrey, BC Under construction
10588 160th Street, Surrey, BC Under construction
13730 72nd Avenue, Surrey, BC Under construction
The Corporation of the Township of Langley 1 electric vehicle fast-charging station $50,000 Green Infrastructure - Phase 2 British Columbia 4700 224 Street, Langley, BC Under construction
Ontario Charging Network LP, by its General Partner 2587265 Ontario Inc. 60 electric vehicle fast-charging stations $3,000,000 Green Infrastructure - Phase 2 Ontario 2650 Tecumseh Road West, Windsor, ON
(2 stations)
Under construction
656 Erb Street West, Waterloo, ON
(2 stations)  
Under construction
127 Stone Road West, Guelph, ON
(2 stations)
Under construction
686 Queenston Road, Hamilton, ON
(2 stations)  
Under construction
400 Dundas Street East, Oakville, ON
(2 stations)
Under construction
99 McEwan Drive East, Bolton, ON
(2 stations)
Under construction
110 Young Street, Alliston, ON
(2 stations)
Under construction
75 45th Street South, Wasaga Beach, ON
(2 stations)
Under construction
24270 Woodbine Avenue, Keswick, ON
(2 stations)
Under construction
17750 Yonge Street, Newmarket, ON
(2 stations)
Under construction
2900 Major Mackenzie Drive East, Markham, ON
(2 stations)
Under construction
1333 Wilson Road North, Oshawa, ON
(2 stations)
Under construction
2501 Greenbank Road, Nepean, ON
(2 stations)
Under construction
1820 Merivale Road, Nepean, ON
(2 stations)
Under construction
2129 St. Clair Avenue West, Toronto, ON
(2 stations)
Under construction
1616 Cyrville Road, Gloucester, ON
(2 stations)
Under construction
2121 10th Line, Orleans, ON
(2 stations)
Under construction
3225 Monarch Drive, Orillia, ON
(2 stations)
Under construction
470 Holland Street West, Bradford, ON
(2 stations)
Under construction
15360 Bayview Avenue, Aurora, ON
(2 stations)
Under construction
1700 Victoria Street East, Whitby, ON
(2 stations)
Under construction
60 Grand Marshall Drive, Toronto, ON
(2 stations)
Under construction
50 Kirkham Drive, Markham, ON
(2 stations)
Under construction
2911 Eglinton Avenue East, Toronto, ON
(2 stations)
Under construction
90 Billy Bishop Way, Toronto, ON
(2 stations)
Under construction
825 Caledonia Road, Toronto, ON
(2 stations)
Under construction
2920 Argentia Road, Mississauga, ON
(2 stations)
Under construction
60 Great Lakes Drive, Brampton, ON
(2 stations)
Under construction
9201 Islington Avenue, Woodbridge, ON
(2 stations)
Under construction
900 Clark Avenue West, Thornhill, ON
(2 stations)
Under construction
Newfoundland and Labrador Hydro 14 electric vehicle fast-charging stations

14 Level 2 electric vehicle charging stations
$770,000 Green Infrastructure - Phase 2

Zero-Emission Vehicle Infrastructure Program
Newfoundland and Labrador 460 Kenmount Road, St. John’s, NL
(2 stations)
Under construction
3 Holyrood Access, Holyrood, NL
(2 stations)
Under construction
679 Whitbourne Road, Whitbourne NL,
(2 stations)
Under construction
162 Trans-Canada Highway, Goobies, NL
(2 stations)
Under construction
45 Blackmore's Road, Port Blandford, NL
(2 stations)
Under construction
1 High Street, Channel-Port-aux-Basques, NL
(2 stations)
Under construction
104 Trans-Canada Highway, Gander, NL
(2 stations)
Under construction
100 Trans-Canada Highway, Bishop’s Falls, NL
(2 stations)
Under construction
2 Badger Road, Badger, NL
(2 stations)
Under construction
48 Aspen Street, South Brook, NL
(2 stations)
Under construction
62 Trans-Canada Highway, Deer Lake, NL
(2 stations)
Under construction
8 Confederation Drive, Corner Brook, NL
(2 stations)
Under construction
44 Queen Street, Stephenville Crossing, NL
(2 stations)  
Under construction
1 Trans-Canada Highway, Doyles, NL
(2 stations)
Under construction
Nanaimo Airport Commission 4 electric vehicle fast-charging stations $200,000 Green Infrastructure - Phase 2 British Columbia 3350 Spitfire Road, Cassidy, BC
(4 stations)
Under construction
The Corporation of the District of Summerland 2 electric vehicle fast-charging stations $100,000 Green Infrastructure - Phase 2 British Columbia 12900 Lakeshore Drive, Summerland, BC Under construction
9999 Wharton Street, Summerland, BC Under construction
Squamish Liquor Store (2016) Ltd. 2 electric vehicle fast-charging stations $100,000 Green Infrastructure - Phase 2 British Columbia 38241 Cleveland Avenue, Squamish, BC (2 stations)   Under construction
9447326 Canada Ltd. 2 electric vehicle fast-charging stations $100,000 Green Infrastructure - Phase 2 Ontario 8786 Highway 155s, Orono, ON
(2 stations)
Under construction
County of Vermilion River 1 natural gas refuelling station $647,000 Green Infrastructure - Phase 2 Alberta 505040 Highway 897, Kitscoty, AB Under construction
City of Richmond 4 electric vehicle fast-charging stations

8 Level 2 electric vehicle charging stations  
$240,000 Green Infrastructure - Phase 2

Zero-Emission Vehicle Infrastructure Program
British Columbia 6911 No. 3 Road, Richmond, BC
(3 stations)
Under construction
6111 River Road, Richmond, BC
(3 stations)
Under construction
14300 Entertainment Boulevard, Richmond, BC
(3 stations)
Under construction
4100 No. 5 Road, Richmond, BC
(3 stations)  
Under construction
Suncor Energy Products Partnership, an Alberta Partnership 6 electric vehicle fast-charging stations $300,000 Green Infrastructure - Phase 2 British Columbia, Ontario, New Brunswick 731 Centre Street, Espanola, ON Open to the public
19971 72 Avenue,
Langley, BC
(2 stations)
Under construction
2693 Highway 97,
Kelowna, BC
(2 stations)
Under construction
244 Route 122,
Meductic, NB
Under construction
City of Port Moody 1 electric vehicle fast-charging station $50,000 Green Infrastructure - Phase 2 British Columbia 300 Loco Road, Port Moody, BC Open to the public
The Seneca College of Applied Arts and Technology 2 electric vehicle fast-charging stations $100,000 Green Infrastructure - Phase 2 Ontario 1750 Finch Avenue East, Toronto, ON
(2 stations)
Open to the public
British Columbia Ministry of Transportation and Infrastructure 18 electric vehicle fast-charging stations $900,000 Green Infrastructure - Phase 2 British Columbia 114 Crowsnest Highway, Hope, BC
(2 stations)
Open to the public
1V6 Crowsnest Highway, Osoyoos, BC
(2 stations)
Under construction
1073 BC-5, Kamloops, BC
(2 stations)
Open to the public
9916 Bean Road, Little Fort, BC
(2 stations)
Open to the public
6638 Parkinson Road, Port Renfrew, BC
(2 stations)

 

Open to the public
Yellowhead Highway, Fraser-Fort George F, BC
(2 stations)
Under construction
97, Windt Road, Cariboo A, BC
(2 stations)
Open to the public
155 Wrangler Way, 100 Mile House, BC
(2 stations)
Open to the public
Englewood Drive and BC-19, Woss, BC
(2 stations)
Under construction
Hydrogenics Corporation 1 hydrogen refuelling station $1,000,000 Green Infrastructure - Phase 2 Quebec 3562 Boulevard Saint-Charles, Kirkland, QC Under construction
PEI Energy Corporation 6 electric vehicle fast-charging stations $300,000 Green Infrastructure - Phase 2 Prince Edward Island 1037 O'Leary Road, O'Leary, PEI Under construction
465 Sherbrooke Road, Prince County, PEI Under construction
125 Abegweit Boulevard, Borden-Carleton, PEI Under construction
20 Babineau Avenue, Charlottetown, PEI Under construction
13056 Shore Road, Belle River, PEI Under construction
63 Main Street, Souris, PEI Under construction
Groupe Alfred Boivin 1 natural gas refuelling station $1,000,000 Green Infrastructure - Phase 2 Quebec 2205 Rue de la Fonderie, Saguenay, QC Under construction
HTEC Hydrogen Technology and Energy Corporation 1 hydrogen refuelling station $1,000,000 Green Infrastructure - Phase 2 British Columbia 2501 Westview Drive, North Vancouver, BC Under construction
HTEC Hydrogen Technology and Energy Corporation 1 hydrogen refuelling station $1,000,000 Green Infrastructure - Phase 2 British Columbia 4001 Quadra Street, Victoria, BC Under construction
British Columbia Hydro and Power Authority 23 electric vehicle fast-charging stations $1,150,000 Green Infrastructure - Phase 2 British Columbia 2155 Ferry Avenue, Prince George, BC Under construction
100 Robson Centre, McBride, BC Open to the public
1300 5th Avenue, Valemount, BC Open to the public
1270 Stage Road, Cache Creek, BC Open to the public
1423 BC-97, Clinton, BC Open to the public
1556 BC-97, 70 Mile House, BC Open to the public
450 Mart Street, Williams Lake, BC Open to the public
2335 Maple Drive, Quesnel, BC Open to the public
39126 Cariboo Highway, Hixon, BC Open to the public
883 Highway 5, Blue River, BC Open to the public
2332 160th Street, Surrey, BC Open to the public
350 South East Marine Drive, Vancouver, BC Open to the public
77 Lougheed Highway, Seabird Island, BC Under construction
1594 Beach Drive, Port McNeill, BC Under construction
7250 Market Street, Port Hardy, BC Open to the public
1750 56th Street, Delta, BC Open to the public
4535 Willingdon Avenue, Powell River, BC Open to the public
4651 No.3 Road, Richmond, BC Open to the public
1830 Old Island Highway, Colwood, BC Open to the public
3544 Blanchard Street, Victoria, BC Open to the public
12808 Madeira Park Road, Madeira Park, BC Open to the public
140 1st Street East, North Vancouver, BC Open to the public
3000 Lougheed Highway, Coquitlam, BC Open to the public
2587265 Ontario Inc. 70 electric vehicle fast-charging stations $3,500,000 Green Infrastructure - Phase 2 Ontario 5001 Concession Road 8, Old Castle, ON
(3 stations)
Under construction
9386 Pinehurst Line, Chatham, ON
(3 stations)
Under construction
4380 Wellington Road South, London, ON
(3 stations)
Under construction
145 McGovern Drive, Cambridge, ON
(3 stations)
Under construction
680 Laval Drive, Oshawa, ON
(3 stations)
Under construction
1037 Sydenham Road, Kingston, ON
(3 stations)
Under construction
2900 Power Dam Drive, Cornwall, ON
(3 stations)
Under construction
750 Front Street, Point Edward, ON
(3 stations)
Under construction
28895 Centre Road, Strathroy, ON
(2 stations)
Under construction
80 King George Road, Brantford, ON
(2 stations)
Under construction
4585 Cherry Avenue South, Lincoln, ON
(3 stations)
Under construction
306 Tiffin Street, Barrie, ON
(3 stations)
Under construction
2820 Quarry Road, Severn, ON
(3 stations)
Under construction
121 Bowes Street, Parry Sound, ON
(2 stations)
Open to the public
1526 Highway 69, Archipelago, ON
(2 stations)
Under construction
25 White Road, Greater Sudbury, ON
(3 stations)
Under construction
360 Great Northern Road, Sault Ste Marie, ON
(2 stations)
Open to the public
43 Causley Street, Blind River, ON
(2 stations)
Open to the public
630 Graham Drive, North Bay, ON
(2 stations)
Under construction
167 Biggs Road, Laurentian Valley, ON
(2 stations)
Under construction
309 Colonnade Drive, Kemptville, ON
(2 stations)
Under construction
Highway 11, Strong, ON
(2 stations)
Under construction
150 Hanes Road, Huntsville, ON
(2 stations)
Open to the public
1726 Winhara Road, Gravenhurst, ON
(3 stations)
Under construction
440 Ashburnham Drive, Peterborough, ON
(2 stations)
Under construction
Highway 37 (West Side), Tweed, ON
(2 stations)
Under construction
99 Drummond Street West, Perth, ON
(2 stations)
Under construction
955 9th Avenue East, Owen Sound, ON
(2 stations)
Under construction
2587265 Ontario Inc. 30 electric vehicle fast-charging stations $1,500,000 Green Infrastructure - Phase 2 Ontario 60 Rabbit Lake Road, Kenora, ON
(2 stations)
Under construction
551 Holmes Avenue, Fort Frances, ON
(2 stations)
Under construction
16655 Highway 17, Dryden, ON
(2 stations)
Under construction
Highway 599, Ignace, ON
(2 stations)
Under construction
205 Burwood Road, Thunder Bay, ON
(2 stations)
Under construction
100 Mill Road, Nipigon, ON
(2 stations)
Under construction
217 Peninsula Road, Marathon, ON
(2 stations)
Under construction
100 Anjigami Road, Algoma, ON
(2 stations)
Under construction
416 Michael Power (Highway 584), Geraldton, ON
(2 stations)
Under construction
Highway 583, Hearst, ON
(2 stations)
Under construction
Highway 11, Black River-Matheson, ON
(2 stations)
Under construction
221 Shepherdson Road, New Liskeard, ON
(2 stations)
Under construction
1 King Street, Chapleau, ON
(2 stations)
Under construction
535 Moneta Avenue, Timmins, ON
(2 stations)
Under construction
Highway 11, Fauquier-Strickland, ON
(2 stations)
Under construction
University of the Fraser Valley 1 electric vehicle fast-charging station $44,915 Green Infrastructure - Phase 2 British Columbia 33844 King Road, Abbotsford, BC Open to the public
The Corporation of the City of Kingston 2 electric vehicle fast-charging stations $100,000 Green Infrastructure - Phase 2 Ontario 379-399 King Street East, Kingston, ON
(2 stations)
Open to the public
Hydro Québec 20 electric vehicle fast-charging stations $993,000 Green Infrastructure - Phase 2 Quebec 460 Boulevard Saint-Joseph, Drummondville, QC
(2 stations)
Open to the public
5001 Boulevard Bourque, Sherbrooke, QC
(2 stations)
Under construction
4320 Route Marie-Victorin, Contrecoeur, QC
(2 stations)
Open to the public
134 Rue Robitaille, Granby, QC Open to the public
464 Rue Notre Dame Ouest, Victoriaville, QC Open to the public
225 Rue King, Thetford Mines, QC
(2 stations)
Open to the public
4800 Boulevard Industriel, Sherbrooke, QC Under construction
535 1re Avenue, Asbestos, QC Open to the public
1120 Avenue des Cascades, Valcourt, QC Open to the public
320, rue de Roxton, Acton Vale, QC
(2 stations)
Open to the public
125 Rue du Traversier, Sorel-Tracy, QC Under construction
2471 Rue Immaculée-Conception, Saint-Ours, QC Open to the public
810 Rue Notre Dame, Saint-Rémi, QC Open to the public
555 Rue Ellice, Beauharnois, QC
(2 stations)
Open to the public
Hydro Québec 40 electric vehicle fast-charging stations $2,000,000 Green Infrastructure - Phase 2 Quebec 373 Route 105, Kazabazua, QC Open to the public
182 Rue Notre-Dame, Maniwaki, QC Under construction
41 Rue Richard, Saint-Alexis-des-Monts, QC Open to the public
200 Route 138, Donnacona, QC
(2 stations)
Open to the public
1040 Boulevard Sainte-Sophie, Sainte-Sophie, QC Open to the public
1175 Route 125, Sainte-Julienne, QC
(2 stations)
Open to the public
101 Rue de la plage, St-Alphonse-Rodriguez, QC Under construction
413 Rue Principale, Saint-Donat-de-Montcalm, QC Open to the public
931 Route de Louis Cyr, Saint-Jean-de-Matha, QC Open to the public
51 Rue Sainte-Anne, Ville Marie, QC Open to the public
467 Rue Kipawa, Temiscaming, QC Open to the public
75 Avenue Québec, Rouyn-Noranda, QC Open to the public
315 Route 117, Val-d'or, QC Open to the public
201 4e Avenue, Péribonka, QC Under construction
5850 Boulevard Talbot, La Terrière, QC Open to the public
1262 6e Avenue, La Baie, QC Under construction
1517 Rue Principale, Chambord, QC Open to the public
1297 Boulevard du Sacré-Coeur, Saint-Félicien, QC Open to the public
3911 Route 155, Deux-Rives, QC Under construction
29 Chemin d'en Haut, Natashquan,QC Open to the public
1235 Rue de la Digue, Hâvre St-Pierre, QC Under construction
3515 B Queen, Rawdon, QC Open to the public
1401 Boulevard Laure, Sept-Iles, QC
(2 stations)
Open to the public
40 Avenue Parent, Port-Cartier, QC Open to the public
20 Avenue Chapais, Baie-Comeau, QC
(2 stations)
Open to the public
162 Rue des Jésuites, Tadoussac, QC Under construction
2 Route de Tewkesbury, Stoneham, QC
(2 stations)
Open to the public
4756 route de Fossambault, Sainte-Catherine-de-la-Jacques-Cartier, QC
(2 stations)
Open to the public
418 Route 169 , Sainte Jeanne D'arc, QC Open to the public
5791 Avenue du Pont Nord, Alma, QC
(2 stations)
Open to the public
5146 Boulevard Wilfrid-Hamel, Ancienne-Lorette, QC
(2 stations)
Open to the public
575 Rue St-Eugène, La Tuque, QC
(2 stations)
Open to the public
Hydro Québec 40 electric vehicle fast-charging stations $2,000,000 Green Infrastructure - Phase 2 Quebec 90 Jean-Baptiste Casault, Montmagny, QC
(4 stations)
Open to the public
5625, boulevard Jean-XXIII, Trois-Rivières, QC
(4 stations)
Open to the public
1553 Boulevard Hubert-Biermans, Shawinigan, QC
(4 stations)
Open to the public
575, boulevard Arthur-Sauvé, Saint-Eustache
(4 stations)
Open to the public
510 Rue Béthany, Lachute, QC
(4 stations)
Open to the public
2939, boulevard St-Charles, Kirkland, QC
(4 stations)
Open to the public
8-100, boulevard Bromont, Bromont, QC
(4 stations)
Open to the public
180 Rang du Moulin Rouge, St-Léonard d'Aston, QC
(4 stations)
Open to the public
390 Rue Laurier, St-Apollinaire, QC
(4 stations)
Open to the public
Sortie 305 de l'autoroute 20, Lévis, QC
(4 stations)
Open to the public
Envoy Alternative Fuels Inc. 1 natural gas refuelling station $1,000,000 Green Infrastructure - Phase 2 Ontario 1521 Bowen Road, Fort Erie, ON Open to the public
New-Brunswick Power Corporation 7 electric vehicle fast-charging stations $350,000 Green Infrastructure - Phase 2 New Brunswick 22 Budd Avenue, St. Stephen, NB Open to the public
24 Reed Avenue, Saint Andrews, NB Open to the public
201 Main Street, Sussex, NB Open to the public
527 King Street, Fredericton, NB Open to the public
375 Main Street, Shediac, NB Open to the public
157 Water Street, Campbellton, NB Open to the public
39 W St. Peter Boulevard, Caraquet, NB Open to the public
City of Vancouver 6 electric vehicle fast-charging stations $300,000 Green Infrastructure - Phase 2 British Columbia 600 National Avenue, Vancouver, BC
(2 stations)
Under construction
455 W 10th Avenue, Vancouver, BC
(2 stations)
Under construction
450 Beach Crescent, Vancouver, BC
(2 stations)
Under construction
Governors of Acadia University 1 electric vehicle fast-charging station $50,000 Green Infrastructure - Phase 2 Nova Scotia 550 Main Street, Wolfville, NS Under construction
Corporation of the City of North Vancouver 1 electric vehicle fast-charging station $50,000 Green Infrastructure - Phase 2 British Columbia 141 W 14th Street, North Vancouver, BC Open to the public 
FortisBC Inc. 12 electric vehicle fast-charging stations $600,000 Green Infrastructure - Phase 2 British Columbia 1435 Water Street, Kelowna , BC Open to the public
250 Highway 33 West, Kelowna, BC Open to the public
5538 Airport Way, Kelowna, BC
(2 stations)
Open to the public
5842 Highway 33, Beaverdell, BC Open to the public
6201 45th Street, Osoyoos, BC Open to the public
111 Enterprise Way, Oliver, BC Open to the public
2045 Washington Street, Rossland, BC Open to the public
315 Hall Street, Nelson, BC Open to the public
315 Fourth Street, Kaslo, BC Open to the public
712 Kootenay Street, New Denver, BC Open to the public
92 - 6th Avenue North-West, Nakusp, BC Open to the public
FortisBC Energy Inc. 1 natural gas refuelling station $868,000 Green Infrastructure - Phase 2 British Columbia 2982 Ulverston Road, Cumberland, BC Under construction
FortisBC Energy Inc. 1 natural gas refuelling station $618,000 Green Infrastructure - Phase 2 British Columbia 2935 Acland Road, Kelowna, BC Under construction
Canadian Tire Corporation, Limited 18 electric vehicle fast-charging stations $900,000 Green Infrastructure - Phase 2 Manitoba, Saskatchewan 1731 Preston Avenue, Saskatoon
(2 stations)
Under construction
11802 Railway Avenue East, North Battleford, SK Under construction
2302 8 Avenue, Humboldt, SK Under construction
1811 22nd Avenue North-East, Swift Current, SK Under construction
655 Albert Street, Regina, SK
(2 stations)
Under construction
2325 Prince Of Wales Drive, Regina, SK
(2 stations)
Under construction
1240 Sims Avenue, Weyburn, SK Under construction
200 King Street, Estevan, SK Under construction
2445 Saskatchewan Avenue West, Portage La Prairie, MB
(2 stations)
Under construction
3615 Portage Avenue, Winnipeg, MB Under construction
1711 Kenaston Boulevard, Winnipeg, MB
(2 stations)
Under construction
1041 Manitoba Avenue, Selkirk, MB Under construction
131 Pth 12 North,Steinbach, MB Under construction
Canadian Tire Corporation, Limited 20 electric vehicle fast-charging stations $1,000,000 Green Infrastructure - Phase 2 Ontario 430 Holland Street West, Bradford, ON
(2 stations)
Under construction
1017 Brodie Drive, Orillia, ON Under construction
69 Balsam Street, Collingwood, ON
(3 stations)
Under construction
1093 Ontario Street, Stratford, ON Under construction
575 Grand Avenue West, Chatham, ON Under construction
255 Garrison Road, Fort Erie, ON Under construction
44 Livingston Avenue Grimsby, ON
(2 stations)
Under construction
476 Centre Street North, Napanee, ON Under construction
1050 O'Brien Road, Renfrew, ON
(2 stations)
Under construction
245 Daniel Street South, Arnprior, ON Under construction
2010 Ogilvie Road, Gloucester, ON
(2 stations)
Under construction
30 Pine Drive, Parry Sound, ON
(2 stations)
Under construction
1525 Cameron Street, Hawkesbury, ON Under construction
Canadian Tire Corporation, Limited 16 electric vehicle fast- charging stations $800,000 Green Infrastructure - Phase 2 Alberta, British Columbia 8277 Ontario Street, Vancouver, BC
(2 stations)
Under construction
2830 Bentall Street, Vancouver, BC
(2 stations)
Under construction
10200 McDonald Park Road, North Saanich, BC
(2 stations)
Under construction
960 Railway Street, Penticton, BC
(2 stations)
Under construction
101-3550 Carrington Road, Westbank, BC
(2 stations)
Under construction
1791 9 Avenue, Fernie, BC Under construction
5919 2 Avenue, Edson, AB
(2 stations)
Under construction
2110 101 Street North-West, Edmonton, AB
(2 stations)
Under construction
109 - 900 Pine Road, Strathmore, AB Under construction
Suncor Energy Products Partnership, an Alberta Partnership 20 electric vehicle fast-charging stations $999,940 Green Infrastructure - Phase 2 New Brunswick, Nova Scotia, Quebec 231 Herring Cove Road, Halifax, NS
(2 stations)
Open to the public
2600 Mountain Road R.R. No. 7, Moncton, NB
(2 stations)
Open to the public
81 Main Street West, Stewiacke, NS
(2 stations)
Open to the public
191 Chemin Fraserville, Riviere Du Loup, QC
(2 stations)
Open to the public
704 Rue De L'Eglise, St-Jean-Port-Joli, QC
(2 stations)
Open to the public
1230 Chemin Des Oliviers,St-Nicolas, QC
(2 stations)
Open to the public
546 - 3E Rang, Ste-Helene De Bagot, QC
(2 stations)
Open to the public
855 Chemin Saint-Fereol, Les Cedres, QC
(2 stations)
Open to the public
395 Montee Paiement, Gatineau, QC
(2 stations)
Open to the public
2525 Grande Allee, Boisbriand, QC
(2 stations)
Open to the public
Suncor Energy Products Partnership, an Alberta Partnership 22 electric vehicle fast-charging stations $1,099,900 Green Infrastructure - Phase 2 Alberta, Manitoba, Saskatchewan 55097 Provincial Road 207, Dugald, MB
(2 stations)
Open to the public
43146 Highway 1 West, Portage La Prairie, MB
(2 stations)
Under construction
100 Highland Avenue, Brandon, MB
(2 stations)
Open to the public
450 North Service Road, Moose Jaw, SK
(2 stations)
Open to the public
2910 E Quance Street, Regina, SK
(2 stations)
Open to the public
2900 Box Springs Boulevard North-West, Medicine Hat, AB
(2 stations)
Open to the public
42148 Highway #1, Calgary, AB
(2 stations)
Open to the public
1731 Mountain Avenue, Canmore, AB
(2 stations)
Open to the public
1701 North Service Road East, Swift Current, SK
(2 stations)
Open to the public
100 64273 Highway 7 East, Aldersyde, AB
(2 stations)
Open to the public
293114 Crossiron Boulevard, Rocky View, AB
(2 stations)
Open to the public
Suncor Energy Products Partnership, an Alberta Partnership 26 electric vehicle fast-charging stations $1,300,000 Green Infrastructure - Phase 2 Ontario 3733 Highway 7 West, Woodbridge, ON
(2 stations)
Open to the public
185 Ferris Lane, Barrie, ON
(2 stations)
Open to the public
498 Highway 17, Nipigon, ON
(2 stations)
Open to the public
1063 Dawson Road, Thunder Bay, ON
(2 stations)
Open to the public
713 Trunk Road, Sault Ste Marie, ON
(2 stations)
Open to the public
137 Mission Road,Wawa, ON
(2 stations)
Open to the public
325 Stewart Boulevard, Brockville, ON
(2 stations)
Open to the public
1586 Centennial Drive, Kingston, ON
(2 stations)
Open to the public
638 County Road 41 Rr #6, Napanee, ON
(2 stations)
Open to the public
490 White Street, Cobourg, ON
(2 stations)
Open to the public
3100 Ellesmere Road, Scarborough, ON
(2 stations)
Open to the public
1810 Regent Street, Sudbury, ON
(2 stations)
Open to the public
3305 Dorchester Road, Dorchester, ON
(2 stations)
Open to the public
Suncor Energy Products Partnership, an Alberta Partnership 16 electric vehicle fast-charging stations $800,000 Green Infrastructure - Phase 2 British Columbia 1885 Highway 1 West,Kamloops, BC
(2 stations)
Open to the public
626 Old Hope Princeton Way, Hope, BC
(2 stations)
Under construction
1270 Lynn Valley Road, North Vancouver, BC
(2 stations)
Under construction
5498 Patricia Bay Highway, Victoria, BC
(2 stations)
Open to the public
1100 North Terminal Avenue, Nanaimo, BC
(2 stations)
Open to the public
3591 Voght Street, Merritt, BC
(2 stations)
Open to the public
915 Lakeshore Drive South-West, Salmon Arm, BC
(2 stations)
Under construction
2054 Whatcom Road, Abbotsford, BC
(2 stations)
Open to the public
Suncor Energy Products Partnership, an Alberta Partnership 8 electric vehicle fast-charging stations $400,000 Green Infrastructure - Phase 2 New Brunswick, Ontario, Quebec, Saskatchewan 1 Horseshoe Lake Rd. RR2, Parry Sound, ON
(2 stations)
Open to the public
311 Main Street Highway 17, Ignace, ON
(2 stations)
Open to the public
1203 Highway 1, Whitewood, SK
(2 stations)
Open to the public
315 Rue Ouellette, Grand-Sault, NB
(2 stations)
Open to the public