Project Proposal Energy Manager Program



Applicant Information
(Full address: street address, province, postal code)
If your organization does not have a GST number, please type “NA” in the box.


Contact information of representatives
(name, title, street address, province, postal code, telephone numbers, e-mail)
(name, title, street address, province, postal code, telephone numbers, e-mail)




Project Information


Program offering
Review sections A and B of the Program Conditions
Review sections A and C of the Program Conditions
Review sections A and D of the Program Conditions




Hiring an energy manager in a building or an industrial facility


Project Details
e.g., floor space area, type of economic activity (e.g., industrial process, office space, etc.), number of employees, annual production.
e.g., energy management systems, energy manager/team, projects to reduce energy use, significant energy uses identified in the facility
e.g., environment, health, quality, etc. If yes, specify which system.
e.g. in GJ, kWh, or other
e.g., energy manager and/or energy assessment recommendations



Project budget
Project budget
April 1 to March 31
$
April 1 to March 31
$
$



Identify all proposed project funding sources and their contribution (including Natural Resources Canada)

Natural Resources Canada
April 1 to March 31
$
April 1 to March 31
$
$
(up to $100,000)


Applicant
April 1 to March 31
$
April 1 to March 31
$
$


April 1 to March 31
$
April 1 to March 31
$
$


April 1 to March 31
$
April 1 to March 31
$
$





Conducting an energy assessment in a building or an industrial facility


Project Details
e.g., Level 2 ASHRAE Energy Audit, ENERGY STAR Treasure Hunt
Files must be less than 10 MB.
Allowed file types: pdf doc docx xls xlsx.

e.g., floor space area, type of economic activity (e.g., industrial process, office space, etc.), number of employees, annual production.
e.g., energy management systems, energy manager/team, projects to reduce energy use, significant energy uses identified in the facility
e.g., environment, health, quality, etc. If yes, specify which system.
e.g. in GJ, kWh, or other
e.g., energy manager and/or energy assessment recommendations




Project budget
Project budget
April 1 to March 31
$
April 1 to March 31
$
$



Identify all proposed project funding sources and their contribution (including Natural Resources Canada)

Natural Resources Canada
April 1 to March 31
$
April 1 to March 31
$
$
(up to $40,000 per assessment, maximum $200,000 per organization)


Applicant
April 1 to March 31
$
April 1 to March 31
$
$


April 1 to March 31
$
April 1 to March 31
$
$


April 1 to March 31
$
April 1 to March 31
$
$





Conducting an energy assessment of medium or heavy duty commercial fleet
e.g., Level 2 ASHRAE Energy Audit, ENERGY STAR Treasure Hunt
Please provide the total size of the fleet being assessed, the average tractor age of the fleet, and the total kilometers the fleet travelled in 2018.
Files must be less than 10 MB.
Allowed file types: pdf doc docx xls xlsx.


Project budget
Project budget
April 1 to March 31
$
April 1 to March 31
$
$



Identify all proposed project funding sources and their contribution (including Natural Resources Canada)

Natural Resources Canada
April 1 to March 31
$
April 1 to March 31
$
$
(up to $10,000)


Applicant
April 1 to March 31
$
April 1 to March 31
$
$


April 1 to March 31
$
April 1 to March 31
$
$


April 1 to March 31
$
April 1 to March 31
$
$




There are other fields that you must fill out. Please select at least one Program Offering to continue.




Documentation
If needed please attach a file with any supporting documentation including a budget spreadsheet if you did not have enough room above.
Files must be less than 10 MB.
Allowed file types: pdf doc docx xls xlsx zip.



Certification

I (Enter representative name in text box) an officer of (Enter legal name of organization in text box), certify that the information included in this project proposal is true and correct. I have reviewed and agree to the Energy Manager Program Conditions.